steel structure prefabricated house for painting workshop at Thailand

                            Thailand painting workshop

DETAILED SPECIFICATION OF STEEL STRUCTURE PAINTING PLANT

 Building area:16,623.7sqm Length(m) 166  
Width(m) 55  
Height(m) 9  
 Main steel structure H columns&beams, Q345BH500x250x6x10H400x200x6x8 H300x150x6.5x9 etc. 60 microns epoxy zinc-rich primer painting withRAL-9003 1.1mm-thick anti-fire painting for one hour, RAL-9003
Roof purlin Z purlins,  Q345, Z300x80x20x3.0 galvanized 275gr/m2  
Wall purlin C purlins, Q345, C200x80x20x2.0 galvanized 275gr/m2  
    Secondary frame tie tube:180x6.0, Q235B

Primer

Epoxy zinc-rich, 60 microns with RAL-7035
bracing: steel bar 25mm, Q235B

Middle coat

Epoxy mio paint for 60 microns with RAL-7035
square tube: 100x50x3, Q235B                                

Final coat

Acrylic paint for 30 microns with RAL-9003
Roof panel V-960type 0.5mm  sea blue steel sheet, RAL-5015  
Wall panel V-840 type 0.5mm  white grey, RAL-9002  
Curtain wall glass TP10(LOWE)+12A+TP10mm    
Gutter 5.0mm steel plate with painting  painting same with that of secondary frame
                     

 

     

 

 

Package and delivery

Steel structure

All the steel columns and beams will be packed and sticked to the steel pallets to load into the shipping container, which will also save the energy and cost of unloading at the site.

Weight.around 20 tons per 40'HQ shipping container Wall&Roof sandwich panels

With films on two sides to protect the sanwich panels from the crashing during the loading and transportation. 

 

RFQ

Q1.How about your payment term? A: Both TT and L/C will be accepted. 30% deposit before producing and 70% balance before loading by TT will be more preferred

Q2. How about your delivery time? A: It depends on order quantities. Noramlly, the delivery time will be 45 days after getting the deposit. Q3. How to make the packing? A: The steel frames will be packed by pallets first, then loading them into the shipping container, which will be easy to unload at the site and save the cost for you. All the ends will be packed by the blankets or bubble plastic films. The sandwich panels will also be packed first. Q4. Can you provide the installation help? A: Yes. We can provide you all the drawing by Tekla model, then you can check each part vividly at the site. The installation drawing will also be provided. For some special parts, we can send you the vedio installation guidance. If for some difficult part, we can send our engineers there for installation guidance. If you need, the workers can also be help there. But the cost for them, including the turn-round airplane tickets, accommodation cost at the site, etc. will be born by you there. 

CONTACT

Penny xu  Project manager Mobile/WhatsApp:+86-13625426367 Qingdao Xinmao ZT Steel Construction Co., Ltd


steel structure prefabricated house for painting workshop at Thailand Related Video: