Galvanized Prefab Industrial Structure Steel Warehouse Manufacturer

Galvanized Prefab Prefabricated Structure Steel Warehouse with Large Span Made in China  

Steel Structures Feature:

1.light weight, high strength, large span; 2.short construction period, lower cost; 3.easy move, recycle, environmentally; 4. used widely, used as factory/plant/workshop, warehouse, office building, aircraft hangar etc; 5.structural durability, easy maintenance.

  prefab steel structure wood storage warehouse in Israel 

 

Specification

Main Parts

Item Name

Specification

Main Steel Frame

Steel Column

Q235B, Q345B : H shape, Box, Steel pipe, Hot rolled sheet

Steel Beam

Q235B, Q345B : H shape, Steel Truss, Hot rolled sheet

Supporting System

Brace

Q235B, Q345B : Steel rod, Steel pipe, Angle steel

Roof Purlin

C or Z shape, Steel purlin

Wall Purlin

Q235B, Q346B: C or Z shape, Steel purlin

Roof

Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,

Wall

Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,

Accessories

Bolts

Ordinary, High strength

Gutter

Galvanized Steel plate, Stainless steel

Windows

Aluminum alloy-Glass, Aluminum alloy-shutter, PVC

Doors

Sliding or Rolling door

Downpipes

PVC pipe, Color steel pipe

Edge Cover

Made of color steel sheet thickness 0.5mm

Ventilator

Stainless steel

Crane

Crane in 5 tons to 20 tons

Raw Material and Steel Structure Process:

1. Prepare raw materials : cut steel plate or use internation size H section steel and angle steel, round tube, round steel, square tube etc. 2. Assembly and welding: our welders will follow the drawings to assemble the steel members and weld them together as a entire beam/column/brace and so on

(Our quality inspector will check the steel pieces after finish welding, this is the first quality check) 3. Sand blast : After finish welding and polishing, our sand blast effect can reach internation 2.5 high grade, very good for resist rust; (Secondary quality check) 4.Paint : Within 2 hours after sand blast, all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check) 5.Inspect the goods by client : After we finish a part of fabrication work, we will invite clients to check the goods before we pack the steel frame. 6.Packing and loading : If clients require us to load the goods by close containers, we will pack the steel structure members one by one on the steel skid and tie the whole steel package well.

(The fourth quality check )Main steel frame without packing load in 40' OT, roof and wall panel load in 40' HQ.Or according to customer's requirement.

 

Transport and Installation We provides customers with one-stop integrated housing solution including installation and operation.Engineers and workers can be sent abroad for guidance and installation.       prefab steel structure wood storage warehouse in Israel           

Why Choose Qingdao Xinmao ZT Steel Construction Co., Ltd.    

1. Long History and Rich Experience in Steel Structure :

A. 15 + years Industry Experience B. 600 + projects experience at home and abroad. C. Established trade relations with 20+ countries:Pakistan , Sudan, Mozambique, Uzbekistan, Nigeria, Tobago, Abu Dhabi, Yemen, Jamaica, Ecuador, Qatar, Austrilia, India, Israel, Malaysia, Mauritius, Turkmenistan,ect. 2. Advanced Equipment and Professional Production Line: A. 50,000 square meters factory area B. 600 + well-trained workers. C. 100 +professional engineers with design and construction ability , D. 10 steel structure production lines . E. 80+ sets of large precise and domestically advanced processing equipments.  

3.Production Capacity

A.  50000 Tons Steel Structure Annual Capacity : main steel structure 20000mts,secondary steel 15000mts, various profiling steel sheet 300000 sqm annual

B.  $40000000 Annual Turnover

C.  High Construction Efficiency, delivery time within 20 to 30 days

4. Certification :  A. ISO Certificate for quality, environmental,occupational health and safety B.Steel Structure Construction Qualification Certificate Grade II. C. SGS certification

FAQ

1. Payment Terms ?  30% Down payment and the balance Paid by T/T OR L/C before Shipment or negotiate .

2. Delivery time ?  20-35 days after deposite  

3. Can you offer designing service? Yes, we have more than 100 design engineers. We could design full solution drawings as per your requirments.

4. Do you offer guiding installation on site overseas? Yes, we can provide the service of installation, supervision and training. We also have abroad guiding installation team with 60 people.

Contact :  

Cherry Sun Mobile : +86-15621140557 ( WeChat /WhatsApp ) A: Room 201, Building 32 ,Tian An cyber city, Chengyang district , Qingdao, China


  • Galvanized Prefab Industrial Structure Steel Warehouse Manufacturer Related Video: