China Manufacturer for Method Statement For Steel Structure Building - Smart Prefabricated Mobile Shipping Container House for Home – Xinmao ZT Steel


Description:

Modular portable container house is designed according to specifications of shipping container exactly. It is made of prefab light steel as house frame and sandwich panel for wall and roof, then facilitated with windows, doors, flooring, ceiling, and other additional accessories.

Wide Application

They are also widely applied to warehouse, storage, dormitory, kitchen, shower room, locker room, meeting room, classroom, shop, portable toilet,sentry box, mobile kiosk, moblie toilet,motel, hotel, restaurant, and residential houses, temporary office, residence of under construction, temporary command post, hospital, dining-room, field and outdoor work station and so on. 

Detailed Parameters:
 
20ft/ 40ft  Modular Portable Container House Specifications
External size6058mm(L) * 2438mm(W) * 2591mm(H)  /  12116mm(L)*2438mm(W)*2591mm(H)
House cornerPrefabricated light steel
Roof panelRock Wool / EPS sandwich panel (according to customer requirement)
Wal
 panel
Rock Wool / EPS sandwich panel (according to customer requirement)
Ground basePrefabricated light steel


Basic
 accessories
Window3 / PVC sliding windows
Door1 / 50mm sreel sandwich panel
False CeilingPVC ceiling
FlooringPlywood
Electricity sys2 lights & 1 switch
Optional accessoriesFurniture for housing living, office, dormitory, Toilet, Kitchen, Bathroom, Shower, Etc.
Applicationliving house, office, dormitory, carport, shop, booth, kiosk,  meeting room, canteen,etc.

   
Packing

Roof, bottom frame, column and wall panels of the container house be flat-packed, thus minimizing the transportation volume, can be easily installed on site or be used for transition transportation.
(1) Assembled loading and transportation
One 40ft HC load 2 sets assembled container house with dimension- 5850mm*2250mm*2500mm
(2) Flat-pack transportation:
Plan A: One 20ft GP load 4 sets container houses with dimension- 5850mm*2250mm*2640mm
Plan B: One 40ft HC load 7 sets container houses with dimension- 6055mm 2435mm*2640m
 
Prefabricated Houses Installation Steps

 We will provide you full instruction manual and excellent after sale services. For special projects, we can also send our engineer to help you move in with satisfaction.
1,Excavated
2, Foundation, have, as a brick foundation and concrete foundation
3, Steel structure installation
4, If with many floors, installation of precast floor slab
5, Color steel plate installed
6, The first layer of floor
7, Doors and Windows installation
8, Indoor decoration

About Us
 
Qingdao Xinmao ZT Steel Construction Co.,LTD company is one of the well-established company experienced and specialized in manufacturing various prefab houses and container houses with good quality and competitive price. Co-invested by Shandong Qingyun Xinda Color Steel Structure Engineering Co., Ltd., which is founded in the year of 2003. More than 50 R&D staff and more than 400 workers support us to get the big market share. Our company is a high-tech production-oriented enterprise with a complete system for steel structure production and installation, the company has obtained the international quality certificate of ISO9001 and Steel Structure Construction Qualification Certificate Grade II.

Our service

* Layout plan can be designed if needed.
* Installation introduction / CD / installation drawing will be provided if needed.
* Engineers and workers can be sent abroad for guidance and installation.
* Professional engineers for consultancy and enquiries.

 




  • China Manufacturer for Method Statement For Steel Structure Building - Smart Prefabricated Mobile Shipping Container House for Home – Xinmao ZT Steel Related Video: