China Manufacturer for Method Statement For Steel Structure Building - Prefabricated and Portable Container Carport House for Container Homes – Xinmao ZT Steel


Description:
 
Modular portable container house is designed according to specifications of shipping container exactly. It is made of prefab light steel as house frame and sandwich panel for wall and roof, then facilitated with windows, doors, flooring, ceiling, and other additional accessories.
They have been fitted with functional container house accessories. These container home units are transportable and comfortable to live in temporarily or permanently.
They are fitted with power and lighting and can be accessorized to suit your requirements.

Wide Application

  They are also widely applied to warehouse, storage, dormitory, kitchen, shower room, locker room, meeting room, classroom, shop, portable toilet,sentry box, mobile kiosk, moblie toilet,motel, hotel, restaurant, and residential houses, temporary office, residence of under construction, temporary command post, hospital, dining-room, field and outdoor work station and so on. 

Container House Advantages
* Convenient and various transportation, can be transported as a shipping container, or flat packed.
* Easily removed for short distance, can be relocated without disassembling.
* Tough steel structure improve wind resistant, and seismic resistant.
* Sandwich panel for wall and roof keep good insulation, soundproof, waterproof.
* Flexible designs as per your preference.
* Environment friendly. No waste to be discarded.
* House parts can be separately according to your requirements.
* Little requirements on ground base. Being tough and flat is OK.

Detailed Parameters:
 
ItemDescription
StructureFlat pack@       Cold rolled steel structure with corner casts and forklift pockets 90x256x2050mm
@       Available size,  8ft x 10ft, 8ft x 16ft, 8ft x 20ft, 8ft x 24ft, 8ft x 30ft, 10ft x 20ft
Wall panelExterior Cladding0.5mm thick corrugated or flat galvanized coated steel sheet
Insulation60mm, 70mm, 80mm, 100mm
Internal Cladding@         Laminated E1 - Emission Valued 9mm thick chipboard;
@         White 12.7mm thickness Glass - Magnesium Board MgO;
@         Parallel compressive strength = 18.1 MPa;
@         Formaldehyde emission ≤ 0.1mg/100g;
@         Water expansion ratio = 0.2%;
@         Low smoke and non-flammable;
@         Flammability class A1 - non-combustible;
@         Smoke density: low smoke emission;
@         0.5mm thick galvanized and coated color steel sheet.
floorFloor Steel frame@         3mm thick cold rolled & welded steel profiles;
@         Insulation Thickness: 10mm PU / 100mm mineral wool;
@         Subfloor: 0.5mm thick, galvanized steel sheet;
@         Floor Board: 18mm magnesium(water resistant v 100);
@         The board complies with the emission value E 1;
@         Parallel compressive strength = 35.7 MPa;
@         Formaldehyde emission ≤ 0.4mg/100g;
@         1.5mm thick vinyl sheet;
@         Flammability class B1 - hardly combustible;
@         Smoke density class Q1 - low smoke emission;
@         Welded seams.
 
Fiber cement floor@         Density: 1.26kg/m 3  K= 0.18W/m*k;
@         Waterproof, moisture content = 0.13%/m 2
@         Formaldehyde emission = 0.2 mg/ 100g;
@         Deformation, parallel to the bending elasticity = 6055MPa
 
18mm thick marine grade floor@         Parallel compressive strength = 88MPa;
@         Formaldehyde emission ≤ 0.4mg/100g;
@         Deformation, parallel to the bending elasticity = 8030MPa;
@         Waterproof, moisture content = 6.0%/m 2
 
InsulationMineral wool@         Density : 40kg/m 3  - 120 kg/m 3 (120kg/m3 = 0.25w/m 2 *k)
@         Flammability class A - non-combustible;
@         Smoke density class Q1 - low smoke emission;
@         Certification : CE & GL;
@         Temperature adjustment - 50c & 120c. K= 0.044W/m*k;
@         Water Ratio ≤ 0.5%;
@         Hygroscopic coefficient ≤ 5% & ≥ 98%.
 
PU Foam@         Density : 30kg/m 3  - 40 kg/m 3  (40kg/m 3  = 0.044W/m 2 *k)
@         Flammability class B1 - non-combustible;
@         Smoke density class - low smoke emission;
@         Compressive strength > 150MPa;
@         Water vapor absorption ≤ 6.0ng(Pa*m*s );
@         Hygroscopic coefficient ≤ 4%.
 
Glass wool@         Density : 16kg/m 3  - 24kg/m 3
@         Flammability class A - non-combustible;
@         Smoke density classQ1 - low smoke emission;
@         Coefficient ≤ 4%
 
roofRoof Steel Frame4mm thick cold rolled & welded steel profiles
Roof Cover0.5mm thick galvanized sheet & double folded in the roof middle; Insulation Thickness:     Ceiling Panels: 100mm    9mm chipboard(V20), White(Usual);
50mm   50mm Steel Sandwich panel(Option 1);
100mm 12.7mm Glass Magnesium Board(Option2);
Corner posts4mm thick cold rolled & welded steel profiles, Screwed to the floor base frame and roof frame. 3mm thick cold rolled & welded steel profiles, Screwed to the floor and roof frame.
Door Right or left hand hinged; Inward or outward opening; Steel frame with triangular wrap-around sealing; Door blade with galvanized steel sheets on both sides; Insulated with honeycomb; Aluminum or Steel type; Regular size: 870*2040mm, 870*1995mm.
 Window@       PVC frame with insulated glazing and integrated Aluminum roller shutters;
@       Color: white;
@       Tilt & turn mechanism or sliding;
@       Regular size: 800*1100mm.
 Electrical@     CE,AS/NZ,UL.

   
Roof, bottom frame, column and wall panels of the container house be flat-packed, thus minimizing the transportation volume, can be easily installed on site or be used for transition transportation.
(1) Assembled loading and transportation
One 40ft HC load 2 sets assembled container house with dimension- 5850mm*2250mm*2500mm
(2) Flat-pack transportation:
Plan A: One 20ft GP load 4 sets container houses with dimension- 5850mm*2250mm*2640mm
Plan B: One 40ft HC load 7 sets container houses with dimension- 6055mm 2435mm*2640mm
  
1)SOC delivery;
2)Container loading, flat pack loaded into 40'HQ.
 
Prefabricated Houses Installation Steps

 We will provide you full instruction manual and excellent after sale services. For special projects, we can also send our engineer to help you move in with satisfaction.
1,Excavated
2, Foundation, have, as a brick foundation and concrete foundation
3, Steel structure installation
4, If with many floors, installation of precast floor slab
5, Color steel plate installed
6, The first layer of floor
7, Doors and Windows installation
8, Indoor decoration


About Us
 
Qingdao Xinmao ZT Steel Construction Co.,LTD company is one of the well-established company experienced and specialized in manufacturing various prefab houses and container houses with good quality and competitive price. Co-invested by Shandong Qingyun Xinda Color Steel Structure Engineering Co., Ltd., which is founded in the year of 2003. More than 50 R&D staff and more than 400 workers support us to get the big market share. Our company is a high-tech production-oriented enterprise with a complete system for steel structure production and installation, the company has obtained the international quality certificate of ISO9001 and Steel Structure Construction Qualification Certificate Grade II.
Our service

* Layout plan can be designed if needed.
* Installation introduction / CD / installation drawing will be provided if needed.
* Engineers and workers can be sent abroad for guidance and installation.
* Professional engineers for consultancy and enquiries.

Our advantages:

Company competitive edge
1) Qualification: CE(DIN18800), ISO9001, BV, SGS;
2) Long time oversea project experience;
3) High Construction Efficiency (2 worker in one day for one unit);
4) 4S sales and service network, buy a house just like to buy a car;
5)Totally customized: We can make over wide container house, like 10feet,12feet, even14feet wide.
6) Big productivity: More than 50 units can be produced every day, so we can shorten lead time to meet you needs

Products advantage

1) Integrated base and roof, PU injected, excellent strength and tightness;
2) 0.426mm color steel sheet for sandwich wall panel, strong and beautiful;
3) Durable, beautiful, economic and environmental;
4) Long life time (Max. 10 years);
5) Easy to transport and assemble (Can load 7 units into one 40'HQ).
6) Plug & play: All stuff have been preinstalled in the container and you just need put it on site ,connect to electricity and water
 
FAQ

1. Are you  a factory? 
Yes, we are real factory supplier for over 10 years, own a super technical team to serve adjusting design for customers. 

2. What's the material of your products? 
The steel frame is 3.75mm profiled steel plate. Roof and base is made of steel frame with C steel for purlins, and insulation with rockwool.
The wall is sandwich panel, there are options include EPS foam panel, rockwool panel, fiber glass wool panel and PU/PIR foam panel. 
Sub floor is 15mm MGO board/fiber cenemnt board; sub ceiling is 9mm OSB board.
flooring is 1.5mm vinyl sheet, ceiling is 12mm PVC ceiling plate.
Window is UPVC sliding window, there are options of aluminium shutter or just alumi blade. 
Entrence door is high strength security door, partition door is SIP door.
Electricity is 220V,50-60Hz. 
Plumbing&drainage: optional, we can provide if needed. 

3. Can you supply container house with adjustable design to adapt customers' using requirment ? 
Sure, we have strong technology team, are able to do adjustment design for customers according to users' requirment and the using environment. You can provide us your drawing, and we will produce as your drawings. 

4. What advantages of your products and company? 
1) adjusting design are available from us , to adapt the market and using environment better, and help customers gain more competitions in your market. 
2)longer product life . 

5.How to ship the house? 
It will be flat packed and loaded into the 20ft/40HQ shipping container.
All panels are protected with PE film, and steel structure warped with woven belt. Accessories will be packed with paper box or plastic bags. Windows and doors will be packed with wooden box. 
6. delivery time?
It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days. 
7.Installation?
  We will provide detailed illustration photos and videos to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be borne by buyers. 



 




  • China Manufacturer for Method Statement For Steel Structure Building - Prefabricated and Portable Container Carport House for Container Homes – Xinmao ZT Steel Related Video: